Skip to content
Diamond Drywall, Inc. — San Diego drywall and metal framing contractor

Service

Metal Framing in San Diego.

Light-gauge steel framing for commercial buildouts — partition walls, soffits, headers, bulkheads, and shaft walls. Title 24 and IBC-compliant assemblies.

Metal Framing — Diamond Drywall San Diego

What's included.

Light-gauge cold-formed steel framing for commercial tenant improvements, multi-family, retail, medical, and office buildouts. We frame to plan, plumb, and on schedule — no excuses on layout.

  • 20–25 ga interior partitions

  • Load-bearing & shear assemblies (per engineer)

  • Soffits, bulkheads, ceiling grids

  • Shaft walls & rated corridors

  • Door & window framing, header layout

  • Coordination with MEP rough-in

Free Estimate

Get a clean number on your project.

Free site walk or plan review. Written estimate inside 24–48 hours for most jobs.

Book a Free Estimate →

Or call (619) 471-7233

How We Work

Four steps, on every metal framing project.

01

Free Estimate

Call or book online. We do a site walk or plan review, ask the right questions, and return a clean written quote — usually inside 24–48 hours.

02

Schedule & Mobilize

We lock dates, coordinate with the GC or homeowner, pull materials, and show up with the right crew and stock for the job.

03

Build & Finish

Frame, hang, tape, mud, texture — to the level of finish your project actually needs. Daily site cleanup. Foreman on every job.

04

Walkthrough & Punch

Final walkthrough with you or the super. Anything that's not right, we fix before we invoice. No nickel-and-diming, no callbacks.

FAQ

Metal Framing — common questions.

Don't see your question? Call us — happy to answer it in a sentence.

What gauges do you frame in?

20 ga and 25 ga for non-load-bearing interior partitions, 18 ga and heavier for shear assemblies and load-bearing per the structural engineer. We frame to plan and to the manufacturer's spec.

Do you frame shaft walls?

Yes — CT, CH, and J-stud shaft wall assemblies for elevator, stair, and trash chute enclosures. We build to UL listing and fire-rating spec.

Can you coordinate with MEP rough-in?

Yes. We frame to allow proper rough-in clearance, coordinate with the GC's schedule, and adjust top track for ceiling assemblies during MEP installation. Standard for commercial.

Get Started

Ready to talk metal framing?

Site walk or plan review on us. Clean written estimate in 24–48 hours. No pressure, no spam, no salesy follow-up.